West Pine Creek Feedermain and Sanitary Trunk Project

APPROACH:

Our plan was to work through the flowing sand section using a deep sump dewatering system, however the soil was so unstable that we couldn’t get the system installed without first stripping out the wetland soil, using fill to create a workable base, then excavating through the fill. In collaboration with our Earthworks division, the plan changed to a well point dewatering system as the deep sump system wasn’t performing.

OUTCOME:

Despite the many challenges, we finished on time and significantly under budget. Our crew’s technical experience expanded, and we built a relationship of trust with the client. As a forward thinking collaborator, we were able to dynamically change our original plans based on the site conditions, and not let the change affect the timelines or budget. In fact, in the end, we saved the City of Calgary $4,817,000.